Resources
Notes from the bench, the warehouse and the customs desk.
Written by the people who test the units and book the freight. No trend pieces, no listicles — selection tables, replacement paths and shipment records you can forward to a project engineer.
- 6Published
- 3Content lines
- 4 hReply to a quote
- 0Sponsored posts
Selection & comparison
Two current models, compared on what changes the panel.
Memory, module count, protocol and spares: the four rows that decide most projects, and the one or two that decide the rest.
2 published
Selection
ACS580 or ACS880: overload, encoder and DC bus decide it
Same panel, same tool, same parameter logic. The three questions that separate the ranges are duty class, feedback and where the braking energy goes.
2026-11-056 min
Selection
S7-1200 or S7-1500: how to choose the CPU before the panel is cut
Eight signal modules, no PROFIBUS and roughly 100 KB of program is where the compact controller stops being the cheap choice.
2026-11-046 min
Replacement & obsolescence
What replaces what, and what has to change around it.
Order-number mapping for end-of-sale ranges, with the rewiring, re-addressing and program work the catalog never mentions.
2 published
Replacement
Replacing an ACS355: ACS380, ACS580, or one more tested spare
ABB ended ACS355 sales in 2025. Which route is right depends on whether the machine uses the drive's own sequence logic or only needs to turn a motor.
2026-11-036 min
Replacement
Replacing an S7-300 with an S7-1500: the mapping table and the order it has to happen in
New-part sales for the S7-300 and ET 200M ended on 1 October 2025. Spare-part supply runs to 2033, which is the whole planning horizon you get.
2026-11-025 min
Shipment notes
Batches that actually left Wuhan.
What was in the carton, how it was routed, which documents were issued, and what the customs broker asked for afterwards.
2 publishedAll shipment notes ›
Shipments · SN-2026-10
Two cartons to Augsburg: a CPU, two drives and a panel, four days door to door
Ten units, 12.6 kg, DAP by DHL Express. What the customs agent asked for and why the invoice descriptions changed after this batch.
2026-10-225 min
Shipments · SN-2026-09
186 kg to Hai Phong: a soft starter, an ACS880 and three CPUs by sea
Nine cartons, CIF, 33 days port to port. The pallet stamp, the original bill of lading and why the heaviest carton went on the bottom layer.
2026-10-085 min
How these are written
Every article answers one purchasing question, then stops.
Each piece opens with the answer in one sentence, shows the differences in a table you can paste into a technical comparison, and names the models involved with a link to the part. If a claim cannot be checked against a datasheet or a shipment record, it does not go in.
Articles are reviewed when a range changes or a part number reaches end of sale — not on a publishing calendar. The date under each headline is the date of the last technical review.
- Selection compares two current models on panel space, program size, protocol and spares.
- Replacement gives the order-number mapping and what has to change around it.
- Shipment notes record a real batch: routing, documents, and what the broker asked for.
Nothing here answers it
Send the part number. A person reads it, not a form robot.
Quote back within 4 working hours, Monday to Friday 09:00–18:00 CST, with price, condition, incoterm and dispatch date.